MMHE announces successful loadout of Wellhead Platform for Kasawari

0
2566
Kasawari WHP Loadout. Courtesy: MMHE

Malaysia Marine & Heavy Engineering (MMHE), a subsidiary of Malaysia Marine and Heavy Engineering Holdings Berhad (MHB) announces successful loadout of Wellhead Platform for Kasawari Gas Development Project via its Facebook & LinkedIn today.

The loadout operation was for a 2,000MT Wellhead Platform (WHP) topside structure, which took place on 10 June 2021, marking a total of 939,404 safe man-hours without lost time injury.

The structure successfully sailed away on 24 June 2021 from MMHE West, Pasir Gudang, Johor to Bintulu, Sarawak

In July 2019, MMHE has secured an engineering contract from Petronas Carigali Sdn Bhd for the Kasawari Gas Development project

Source: MMHE